Skip to main content
  • Facebook
  • Twitter
  • Flickr
  • Instagram
  • Linkedin
  • YouTube
  • Newsletter
  • Google+

Solar Decathlon Blog - Solar Decathlon Europe

Below you will find Solar Decathlon news from the Solar Decathlon Europe archive, sorted by date.

Avanzada de Cataluña Wows With PV Innovation

Monday, June 14, 2010

The Instituto de Arquitectura Avanzada de Cataluña house is capturing a lot of excitement at Solar Decathlon Europe. Now, all of the large sections of the house have been assembled and placed.

According to the team’s faculty advisor, Vincente Guallart, the team found a Spanish company to make flexible PV modules using 22%-efficient SunPower cells. On Saturday, a vice president of SunPower visited the team to check on progress. The vice president was excited and intrigued that someone could make a flexible module using the rigid cells. There are 21 cells in series for each module. The flexible material could have been clear, but the team chose black.

Byron Stafford is the site operations manager of the U.S. Department of Energy Solar Decathlon. Throughout the Solar Decathlon Europe competition, U.S. Department of Energy Solar Decathlon organizers are reporting from Madrid.

U.S. Department of Energy Solar Decathlon Director Richard King Reports From Solar Decathlon Europe

Sunday, June 13, 2010

Solar Decathlon Europe is spectacular, wonderful, amazing, and awesome. The teams of students and faculty are just wonderful to talk to, and the homes they are building are even more brilliant than anything we have seen at past events.  Maybe it’s the fifth generation, maybe it’s the Spanish rules, or maybe it’s the international diversity, but Solar Decathlon Europe is sure to be historic in terms of showcasing what the state of the art is around the world.  I am trying to put into words what my jet-lagged brain is trying to say, and hopefully more will become clear as the event progresses, but to bring together the best thinking from around the world must be significant. We are all looking for solutions, and to bring all these ideas together in a competitive melting pot so we can all learn from each other—you just have to believe progress is being accelerated. (more…)

Day 5: Solar Decathlon Europe Teams Prepare for Electrical Connections

Friday, June 11, 2010

There was a distinct shift in the types of construction activities at Solar Decathlon Europe today, Day 5, June 11. All of the teams have received and placed their large house sections on their lots. The University of Florida received its second and last house section this morning. By 10 a.m., it was hard to tell that Florida was delayed several days getting its oversized house sections to its lot. (more…)

Day 4: Villa Solar Under Construction Along the River

Thursday, June 10, 2010

Construction of the Solar Decathlon Europe houses continued today, June 10. Progress is evident every day. (more…)

Thinking Outside the Box (An International Shipping Container)

Thursday, June 10, 2010

By Amy Vaughn

All overseas teams that have competed in the U.S. Department of Energy Solar Decathlon have shipped their house sections in an international shipping container or made their house section the same size as one. This is very convenient because handling, lifting, and moving an international shipping container is relatively easy and no extra paperwork is required for transport on public roads.

(more…)

University of Florida Moves to Villa Solar

Wednesday, June 9, 2010

After several days and many challenges, the University of Florida finally placed its first, and largest, house section on its lot late in the night on Day 3. The team had shipped its parts and subassemblies to a construction site about 25 km away from the Villa Solar. Working weeks before the opening ceremony, the team constructed two large house sections. Although the team is now several days behind schedule, it should quickly make up that lost time. The smaller house section should be placed soon.

Despite the rain, all of the teams are progressing well on the construction of their houses.

Byron Stafford is the site operations manager of the U.S. Department of Energy Solar Decathlon. Throughout the Solar Decathlon Europe competition, U.S. Department of Energy Solar Decathlon organizers are reporting from Madrid.

Rain Falls While Construction Progresses in the Villa Solar

Wednesday, June 9, 2010

Imagine having to work all day and night outside in cold rain. The Solar Decathlon Europe 2010 competitors are working in these conditions on the third day of assembly. With rain forecast through Sunday, the teams will have to get used to constructing their houses in the rain. But most would prefer the rain now than during the competition, when they’ll need sunshine to power their houses. (more…)

Construction Continues at Solar Decathlon Europe

Tuesday, June 8, 2010

With big trucks rolling onto the Villa Solar throughout the night, the Solar Decathlon Europe competition site is quickly taking shape. Many team sites contain houses that are already half built. Others are still nearly empty lots. The Tianjin and Helsinki houses are currently stuck in cargo containers in the port of Valencia, Spain, which is experiencing a strike. Solar Decathlon Europe organizers are working with Spanish government officials to get the containers released. In the meantime, these teams wait and watch their competitors hard at work.

(more…)

Assembly Begins at Solar Decathlon Europe

Monday, June 7, 2010

About 200 decathletes and organizers gathered in Madrid today to kick off Solar Decathlon Europe 2010. Unfortunately, the international economic crisis has hit Solar Decathlon Europe hard, and three of the original 20 teams (Valencia, Mexico, and Brazil) had to drop out of the competition. Following team registration and a welcome meeting, the 17 remaining teams rushed off to begin construction.

(more…)

Archives

Categories

Entries (RSS) | Comments (RSS)